Business 照明 New 建设
Earn incentives for new construction projects
Earn substantial incentives through PSE's Business 照明 program for new construction projects that incorporate energy-efficient lighting and control strategies that are better than energy code requirements. If you're already planning an energy-efficient new construction lighting project, let us help you pay for it.
What is Business 照明 New 建设?
Business 照明 New 建设 (BLnc) uses the 2018 Washington State Energy Code (2018 WSEC) for calculating the lighting baseline and incentives for projects. The total value of your BLnc incentive will depend on the first-year energy savings of your project compared to the 2018 WSEC baseline. The designed lighting power allowance (LPA) must be at least 5% more efficient than the stated 2018 WSEC LPA to qualify.
你得到了什么
Interior and exterior lighting incentives
你有什么资格?
To be eligible for Business 照明 New 建设 incentives:
- Your business site must be within PSE's electric service area.
- Your business site must be for commercial or industrial use.
- The project must be in the design phase, construction phase or completed within the past six months.
- The project must be reviewed by PSE staff before a grant is guaranteed.
如何申请
To be approved for a conservation incentive, all projects require PSE written approval before incentive is approved.
Download and complete the 当前的 Business 照明 standard Application.
On the project page of the Excel document, select "New 建设" in the project type box. Because the BLnc program uses the 2018 energy code, you will be required to know and enter the square footage of the interior spaces and/or the exterior areas that you are applying for.
Submit the following items to businesslighting@wxzjnt.com:
- The Business 照明 Application (.XLSX)
- Print and sign the signature page from the application (.PDF)
- A signed and completed 当前的 taxpayer identification form (IRS form W-9 rev 2018)
- The manufacturer specification sheets of all lighting products included in the project (.pdf文件)
- Building plans showing lighting layout and square footage of each space
- Copy of the Washington State Energy Code compliance forms (if available)
After PSE reviews and approves the application, you will be sent a grant agreement (a contract), which must be signed and returned to PSE within 90 days of receipt to ensure your application and the incentive amount are approved.
新建筑 lighting project applications must be submitted within six months of installation. Applications can be submitted during the design and construction phases but will not be paid until project completion.
The total value of your Business 照明 incentive depends on the size and scope of your project.
额外的信息
PSE has additional incentives for retrofit and tenant improvement lighting projects. 访问 wxzjnt.com/businesslighting 了解更多信息.
A PSE team member will review your application and coordinate meetings between PSE and your team to review design decisions and project specifics. Your project's design details are reviewed so that PSE can determine your eligibility, make energy-efficiency recommendations and estimate your incentive value.